Leviathan Model. Chapter 2 construction.
Actual construction for Masterclass2002 begins with Chapter 2.
Posted on August 19, 2002.
(you can read chapter 2 here.)I spent all of late August and early September moving, so I didnt get started for a few weeks!
![]()
September 14, actual construction begins!![]()
This is the first piece, the base of the pilot.
![]()
The next day..the center of the base is cut out and some spokes are cut.
![]()
![]()
![]()
Spokes sanded smooth. I didn't add all the spokes all at once becuse
the Leviathan has "pusher boards"..and I wasnt yet sure how to build
them into the pilot.
![]()
10 days later, here are the boards! They are not yet bolted to the
pilot, because the pilot must be painted first.
I really can't believe I built all this from scratch!![]()
![]()
![]()
Had some trouble with the cylinder construction. Fletch uses "Araldite" glue to join
un-like surfaces. I was unable to find it in Rochester, so I tried regular 5-minute
epoxy instead..it didnt work! the styrene caps and PVC cylinder tubes are just
too smooth..the glue can't stick. even with "roughing up" (story)
so instead I made my cylinder end caps with the actual epoxy itself! just peeled off
the square styrene caps, and the epoxy formed a smooth plug.
![]()
Here are the epoxy end caps.
![]()
after sanding and painting..not bad!
Pilot is complete! (except for cylinder bands..those will be applied after painting.)
![]()
![]()
![]()
Leviathan Model Chapters
Chapter 1 |
Chapter 2 (you are here) |
Chapter 3 |
Chapter 4 |
Chapter 5 |
Chapter 6 |
Chapter 7 |
Chapter 8 |